Technical
HTC (High Temperature Curing)
Learn more about how Ecoglo’s proprietary manufacturing process produces products with very high luminance and durability.
Check out our Q&As for more information.


Specification Documents
Ecoglo has produced MasterFormat documents for product sets listed below (click to download).
Exit Signs
Hybrid Exit Signs
Egress Path Markings (secondary system)
Emergency Egress (primary system)
Fire Protections Signs
Disaster Preparedness Signs
Anti-Slip Products
The specification documents above list products required in photoluminescent systems to meet international building codes including IFC/IBC and NFPA 101. (See COMPLIANCE section for IFC/IBC and NFPA 101 Compliance Guides.)
***
Ecoglo has also produced a photoluminescent (PL) Safe Movement Specification document for Stadiums & Arenas (download below).
Safe Movement System – Stadiums & Arenas
By providing continuous, highly visible cues, the PL Safe Movement System enhances safety and helps meet or exceed regulatory performance requirements for safe movement and egress in stadiums and arenas.
Luminance Contrast Product Selector
Enter the measured stair tread Light Reflectance Value (LRV) to compare Ecoglo products and calculate luminance contrast.
Valid range: 0 - 100
Adjust if a higher requirement is specified.
Selected product
Recommended alternative
All results (highest contrast first)
| Product | LRV | Contrast | Result |
|---|
Calculation method
Y2 is the LRV of the lighter surface. Y1 is the LRV of the darker surface. LRV values are standalone figures on a 0-100 scale; only the calculated contrast is expressed as a percentage.
Please note: This calculator is a guide only. Final compliance depends on the relevant standard, product selection, installation context and measured surface values.
Disclaimer: LRV values shown are sourced from a combination of independent test reports (Yellow, Grey, Black and S10) and Ecoglo in-house testing (all other products). Values are provided as a guide only and should be verified against project-specific requirements where compliance is critical.






